CONSULTANTS Get a proposal

We write the documents your project runs on.

Letters and notices, submittals, method statements, RFIs, reports, specifications and bills of quantities for contractors on FIDIC projects. Your team stays on site; we work remotely from the contract and the project record.

Site teams build. They rarely have time to write. Submittals come back for missing data, notices go out late and RFIs ask three questions at once. We take that work off them, prepared by engineers who have sat on both sides of the contract.

Who our team has worked for

  • USACEEmployer, airfield programme, Kandahar
  • Central Bank of IraqEmployer, headquarters tower, Baghdad
  • Zaha Hadid ArchitectsDesigner, Central Bank of Iraq tower
  • Koç HoldingEmployer, Koç University health campus, Istanbul
  • World BankFunder, Marmara earthquake housing
  • BACS JVContractor, Riyadh Metro

Projects delivered by members of our team in earlier roles. Names are listed for reference only and do not imply endorsement by these organisations.

What we write

Take the full set or a single document. Every document is checked by a second specialist before it reaches you.

Engineer working on an architectural model at a desk
  1. Project management documentation

    Your remote project office. You share the contract, drawings, programme and correspondence; we prepare what has to be written, check it against the contract and hand it back ready to go out under your letterhead.

  2. Contract correspondence

    Correspondence with the Employer and the Engineer, notices of claim within the contractual time bar, variations and replies to instructions, backed by contemporary records.

    Letters, Notices · 20.1 / 20.2, Variations, Claims

  3. Technical submissions

    Material submittals with clause-by-clause compliance statements, method statements and ITPs written for the site conditions you describe, shop drawing transmittals, and RFIs that ask one clear question.

    Material submittals, Method statements, Transmittals, RFIs

  4. Programmes and reports

    Detailed work programmes, look-aheads, and regular progress reports to the Employer and the Engineer.

    Programmes, Progress reports, MS Project

  5. Document control

    Submittal, RFI and correspondence registers kept current, with every item tracked until the Engineer closes it.

    Registers, Status tracking, Monthly summary

  6. Technical specifications

    Civil, architectural, electrical and mechanical specifications written to the project standards, with clear materials, workmanship and testing requirements.

    Particular specifications, Materials and workmanship, Testing requirements

  7. Contract health check

    An independent review of the contract documents: gaps, conflicts between conditions, specification and drawings, risky clauses and time bars, summarised in a clear report.

    Third-party review, Risk register, Time-bar summary

  8. Bills of quantities

    Quantity take-off from the drawings and a structured bill of quantities for tender, valuation or variation pricing.

    Quantity take-off, BOQ preparation, Variation pricing

Your team stays on site. The paperwork comes to us.

Teams and Zoom
Kick-off, weekly coordination and document review calls.
Your platform
Aconex, SharePoint, Procore or e-mail, whichever the project uses.
One contact
One engineer follows your project from start to close.
Confidential
Project documents stay within the team.

A project office you reach on a call

We work from our Istanbul office, in your time zone when the project needs it. Most engagements start with a one-hour call and a copy of the contract.

Long meeting table in a modern office
Document reviews are held online with the site team.
Laptop showing a video meeting with the project team
Weekly coordination on Microsoft Teams.
Nota Consultants engineer in a suit wearing a white hard hat with the Nota Consultants logo

Remote by default. On site when it counts.

We work remotely from the contract and the project record. Only when it is needed, and as agreed with you, one of our engineers attends important meetings on site.

  • Kick-off meeting with the site team
  • Key meetings with the Engineer and the Employer
  • Claim and dispute meetings

Four disciplines, one desk

Many RFIs and submittals sit where civil, architectural, electrical and mechanical work meet. We write them knowing what each reviewer looks for.

Building frame and tower crane in warm evening light

Civil and structural

Concrete, formwork, earthworks, piling and steel structures.

  • Concrete mix and rebar submittals
  • Pour and formwork method statements
  • Structural RFIs
Cantilevered exposed concrete structure against the sky

Architectural

Finishes, façades, doors and hardware, waterproofing and fit-out.

  • Finish and façade submittals
  • Mock-up and sample records
  • Shop drawing transmittals
MV and LV switchgear room

Electrical

MV/LV distribution, generators, UPS, lighting, fire alarm and ELV systems.

  • Equipment submittals
  • Installation and testing method statements
  • FAT / SAT records
Mechanical ductwork and pipework installed under a ceiling

Mechanical

HVAC, plumbing and drainage, fire fighting and medical gases.

  • Equipment and material submittals
  • Installation method statements
  • Commissioning records

Built for the projects that are hardest to document

We write for Hospitals and healthcare, Ports and marine works, Shipyards, Shopping malls, High-rise buildings, Industrial plants, Factories and manufacturing, Hotels and hospitality, Data centres, Airports, Metro and rail, Roads, bridges and tunnels, Power and energy, Water and wastewater, Government and secure facilities, Education campuses, Offices and headquarters, Residential complexes, Logistics and warehouses and Mixed-use developments.

One office in Istanbul. Projects in any country.

Documents travel; site teams do not have to. We support contractors wherever the project is built, in English or Turkish, across time zones from the Americas to the Far East.

World map with all countries; Nota Consultants' office is in Istanbul
  • New York
  • London
  • Berlin
  • Istanbul
  • Riyadh
  • Dubai
  • Nairobi
  • Tashkent
  • Singapore
  • Sydney

Projects our team has delivered

All 13 projects
  1. Central Bank of Iraq towerBaghdad · design by Zaha Hadid Architects
    97,000 m² · 34 storeysDesign management2025–26
  2. Gynecology and Pediatric Hospital and 4 clinicsTogo
    16,000 m² · 186 bedsArchitecture and project delivery2023–25
  3. Baku ShipyardBaku, Azerbaijan
    42,000 m²Electrical works management2012–14
  4. Koç University Health Sciences Campus, phases 1–2Istanbul, Turkey
    220,000 m² · USD 160MArchitectural works management2004–16
  5. Kandahar Airfield programme, USACEAfghanistan · NATO standards
    ≈ USD 80MElectrical works2010–12

How an engagement runs

  1. Brief

    You tell us about the project and the support you need. We agree scope and timing.

  2. Review

    We read the contract, specification, programme and correspondence, and list the risks.

  3. Prepare

    We write the documents. A second specialist checks each one before it comes back to you.

  4. Issue and track

    You issue under your letterhead. We keep the registers and follow each item until it is closed.

We know what the other side checks

Our team has administered FIDIC contracts as the Engineer and as the Contractor, so we prepare for the questions before they are asked.

Time bars are not missed

Notices follow the contract's own clauses and deadlines, so entitlement is protected from the first letter.

Records that hold up later

Every letter is written knowing it may be read again in a claim or a dispute.

Lit building under construction with a crane at dusk

Documents piling up on site?

Send us one notice, submittal or method statement this week and see how we work.

info@notaconsultants.com