Mechanical documentation

Equipment that fits the space, the duty and the specification.

Mechanical submittals fail when the selected equipment does not meet the duty in the schedules or does not fit the plant room. We check capacities, noise levels, dimensions and connections before the submittal goes out.

Installation method statements cover pressure testing, flushing, balancing and commissioning, with the records the Engineer will need for handover.

What we prepare

  • Chillers, AHUs, FCUs and VRF submittals
  • Pumps, valves and pipework materials
  • Fire fighting systems (sprinkler, hydrant, gas suppression)
  • Medical gas systems for hospitals
  • Pressure test, flushing and balancing method statements
  • Testing and commissioning records

How we work on it

Duty checked

Selections are checked against the equipment schedules and design conditions.

Space checked

Dimensions and maintenance clearances checked against the plant room drawings.

Commissioning planned

Records are planned at submittal stage, not found missing at handover.

When contractors call us

Typical situations where this service saves time, money or entitlement.

  • Chiller selections do not match the equipment schedule.
  • Plant rooms are tight and maintenance clearances are questioned.
  • Fire fighting submittals need hydraulic calculations from the specialist.
  • Commissioning records are requested and none were planned.

Questions

Do you cover medical gases?

Yes, to HTM 02-01 or ISO 7396 as specified.

Can you prepare BMS points lists?

Yes, coordinated between mechanical and electrical submittals.