Industrial plants and factories
Fast-track buildings around process equipment that keeps changing.
Industrial projects are built fast, around process equipment whose data often arrives late. Power demands, foundations and services change as the process design matures, and each change is a potential variation.
Our team has worked on Baku Shipyard on the Contractor's side, and knows how to keep the paper trail of a moving design.
What we prepare
- Process interface RFIs
- Heavy power and substation submittals
- Industrial MEP and utilities submittals
- Variation notices for design changes
- Fast-track programme updates
- Commissioning and handover records
How we work on it
Changes recorded
Every late process data change is logged and notified.
Heavy power
Experience with large MV networks and substations.
Both sides
We have run these projects for the Employer and for the Contractor.
When contractors call us
Typical situations where this service saves time, money or entitlement.
- Process equipment data changes after the building design is fixed.
- Power demand has grown and the substation must be revised.
- Design changes are not being notified as variations.
- The plant must start production on a fixed date.
Questions
Do you work on EPC contracts?
Yes, including FIDIC Silver Book and Yellow Book contracts.
Can you support the owner's engineer?
Yes; our team has worked as the Engineer on an industrial project.