Data centres and mission-critical facilities

Where redundancy has to be proven on paper before it is tested on site.

Data centres are judged on uptime. Every submittal for generators, UPS, switchgear, busbar and cooling has to show how it supports the redundancy concept, and every commissioning step has to be recorded for integrated systems testing.

Our engineers bring mission-critical experience from military airfields, metro systems and industrial plants, and prepare documents with the level of detail that Tier-rated facilities require.

What we prepare

  • Generator, UPS and battery submittals
  • MV/LV switchgear and busbar submittals
  • Cooling plant and CRAH submittals
  • Level 1 to 5 commissioning records
  • Integrated systems test method statements
  • Change and RFI logs for the commissioning agent

How we work on it

Redundancy shown

N, N+1 and 2N arrangements traced through every submittal.

Commissioning levels

Records structured from factory tests to integrated systems tests.

Tight programmes

Long-lead equipment submittals prepared in the first weeks.

When contractors call us

Typical situations where this service saves time, money or entitlement.

  • Long-lead power equipment must be ordered in the first weeks.
  • The commissioning agent asks for records at each level.
  • Redundancy is questioned in every electrical submittal.
  • The programme leaves no room for rejected submittals.

Questions

Do you work to Uptime Institute requirements?

We prepare documents to the project's Tier objective as set out in the Employer's requirements.

Can you support the commissioning agent?

Yes, with scripts, records and issue logs prepared for each commissioning level.