Metro, rail and tunnels
Linear projects with hundreds of interfaces.
Metro projects are run by joint ventures with several designers, systems contractors and an Engineer for each package. Documents must follow the interface matrix, and every change has to be traced across stations and tunnels.
Our team delivered electrical works for four tunnel boring machines on 16 km of the Riyadh Metro, and brings that interface discipline to every document.
What we prepare
- TBM and tunnel power method statements
- Station MEP submittals
- Interface letters with systems contractors
- Temporary works and ventilation submittals
- Joint venture correspondence registers
- Programme updates by section
How we work on it
Interface matrix
Each document checked against the agreed interface responsibilities.
Joint venture aware
Letters written for approval by every partner.
Safety first
Tunnel method statements built around ventilation, fire and evacuation.
When contractors call us
Typical situations where this service saves time, money or entitlement.
- Interfaces with systems contractors are not agreed in writing.
- Tunnel power method statements are needed before the TBM starts.
- Joint venture partners must approve every outgoing letter.
- Station packages run on different programmes.
Questions
Have you worked on metro projects?
Yes, on the Riyadh Metro for the BACS joint venture.
Do you cover railway systems?
We cover power, MEP and civil interfaces; signalling and rolling stock documents stay with their specialists.